Analisa Harga Satuan Pekerjaan Furniture Excel May 2026
If a coefficient is over 1.15 (15% waste), highlight it in red. This flags inefficient designs.
Formula for conditional formatting: =[@Coefficient] > 1.15
For a 2-door wardrobe (1.2m W × 2m H × 0.6m D) :
Here is what an analisa harga satuan pekerjaan furniture excel for a Meja Direktur (Director's Desk) looks like in practice: analisa harga satuan pekerjaan furniture excel
| No | Uraian Pekerjaan | Koefisien | Satuan | Harga Satuan (Rp) | Jumlah (Rp) | | :--- | :--- | :--- | :--- | :--- | :--- | | A | BAHAN | | | | | | 1 | Multiplek 18mm | 0.8 | Lbr | 280,000 | 224,000 | | 2 | Multiplek 12mm | 0.5 | Lbr | 180,000 | 90,000 | | 3 | HPL Tacon 0.8mm | 2.3 | M² | 125,000 | 287,500 | | 4 | Cat Duco | 0.3 | Kg | 85,000 | 25,500 | | 5 | Handle Tarik | 2 | Buah | 15,000 | 30,000 | | B | TENAGA | | | | | | 6 | Tukang Kayu | 1.5 | OH | 150,000 | 225,000 | | 7 | Pengecat | 0.8 | OH | 130,000 | 104,000 | | | TOTAL BASIS | | | | Rp 986,000 | | | Overhead (10%) | | | | Rp 98,600 | | | Profit (15%) | | | | Rp 147,900 | | | HARGA JUAL (Eksisting) | | | | Rp 1,232,500 | | | PPN 11% (optional) | | | | Rp 135,575 |
Unit Price Analysis (Analisa Harga Satuan) is critical for furniture projects where material costs (plywood, solid wood, finishing) and labor (cutting, assembling, laminating) vary significantly. This report outlines a standardized Excel-based system to calculate cost components, markups, and final prices, reducing estimation errors by up to 90% compared to manual methods.
At the bottom of column G, use:
=SUM(G2:G10) + (SUM(G2:G10)*10%) * (Assuming 10% overhead)* If a coefficient is over 1
| Feature | Function | Benefit | |---------|----------|---------| | Solver Add-in | Optimize material cutting layout | Reduce waste by 12-18% | | Pivot Table | Group analisa by furniture type (rak, meja, lemari) | Quick cost comparison | | Form Controls | Profit slider (10-25%) | Instant price simulation | | Dynamic Chart | Cost breakdown pie chart | Present to client |
Ini trik pro. Buat Sheet terpisah bernama "Master Data".
Kembali ke sheet AHS. Pada kolom E (Harga Satuan): Kembali ke sheet AHS
Manfaat: Jika harga multipleks naik dari 300k jadi 350k, Anda cukup update di sheet "Master Data", dan semua sheet AHS akan berubah otomatis.
In the world of construction and interior design, accuracy is profit. Whether you are a contractor bidding for a hotel project, a freelance furniture maker, or a project manager overseeing an office fit-out, one phrase determines whether you end the year in the black or the red: Analisa Harga Satuan Pekerjaan Furniture (Unit Price Analysis for Furniture Work).
Doing this manually is time-consuming and prone to human error. That is why the industry standard has shifted toward a robust, flexible tool: Microsoft Excel. This article serves as a comprehensive guide to creating, utilizing, and mastering an Analisa Harga Satuan Pekerjaan Furniture Excel spreadsheet.